top of page

STORMWATER

The stormwater drainage system through the town has been minimal. More than likely the original system was constructed during the 1930’s.

In 2009, the Town updated the Stormwater Preliminary Engineering Report. As part of this study, several construction alternatives were devised, and a stormwater project was finished in 2012 that helped to alleviate drainage problems throughout the central areas of town that were previously drained by a now defunct county drain. This system starts as a 12” line at the northern end of Town near Levi Street and I-74 and terminates on the south side at the 36” Wheat County Drain.

 

Town Engineer

Lou Savka
5835 Lawton Loop East Dr
Indianapolis, IN 46216

​

Phone: (317) 377-5230
Fax: (317) 377-5241
Website: https://www.triadassoc.net/

 

bottom of page